40 T Water Softening Equipment Installation Conditions
Raw water source: Well water.
Operation mode: Automatic control.
Design boundary: From the inlet of the water softening equipment to the outlet.
Power supply: 220V.
Installation facility: Equipment installation operation room of 30 square meters with underground drainage system.
Customer Requirements
Water usage: For equipment cleaning.
Water production capacity: ≥40m³/h (40 tons/hour, one for use and one for backup).
Process adopted by the equipment
Well water + Water softening equipment (one for use and one for backup) + Fully automatic valve head + Shanghai Nankai resin + Intelligent central replenishment system + 2000 salt box.